Racks Enter the Clean room

22-08-2025 #

The 3 racks enter the clean room #

After 2 weeks of electronic assembly and plumbing work in Bodea room, we bring the entire assembly onto the structure in the clean room.

This is a big step that allows us to continue CCD testing.

Water and electrical circuit
Water and electrical circuit
Moving racks through the obs
Moving racks on the structure through the obs
Wiring
wiring once we arrived in the clean room
Final assembly
Final assembly: the racks are operationnal !